Normalvy
MARC-vy
Techniques for concrete removal and bar cleaning on bridge rehabilitation projects Vorster, Michael C et al
Utgivningsinformation: Washington DC Strategic Highway Research Program, 1992; SHRP-S-336, Beskrivning: 121 sÄmnen: Onlineresurser: Bibl.nr: VTI P1412:336Location: Abstrakt: This report evaluates three technologies for the partial removal of concrete from bridge structures: pneumatic breakers (jackhammers), milling, and hydrodemolition. Analyzes work characteristics, production, cost, and quality of product.Bestånd: VTI P1412:336
This report evaluates three technologies for the partial removal of concrete from bridge structures: pneumatic breakers (jackhammers), milling, and hydrodemolition. Analyzes work characteristics, production, cost, and quality of product.