Normal view
MARC view
Prime coat methods and materials to replace cutback asphalt. Final report Mantilla, Christian A ; Button, Joe W
Publication details: College Station, TX Texas A&M University, 1994; Texas Transportation Institute, ; Research report 1334-1F, Description: 136 sSubject(s): Bibl.nr: VTI P7804:1334-1FLocation:| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Statens väg- och transportforskningsinstitut | Available |