Normalvy
MARC-vy
FORCE 3. Final report
Utgivningsinformation: uo ERTICO, 2000Beskrivning: 25 sÄmnen: Onlineresurser: Abstrakt: This is the FORCE 3 Final Report for January 1997 to December 1999 covering the FORCE 3 Work Areas and links to work carried out in the FORCE 1, 2 and ECORTIS Work Areas. For consistency and transparency the results of the sister projects are included in this report. The projects have met their target to provide traffic message channel (TMC) services across much of Europe.Inga fysiska exemplar för denna post
This is the FORCE 3 Final Report for January 1997 to December 1999 covering the FORCE 3 Work Areas and links to work carried out in the FORCE 1, 2 and ECORTIS Work Areas. For consistency and transparency the results of the sister projects are included in this report. The projects have met their target to provide traffic message channel (TMC) services across much of Europe.