The VTI National Transport Library Catalogue

Normal view MARC view

New method to stabilize the uplift-pressure problem for raft foundations Chang, Dave Ta-Teh et al

By: Publication details: Transportation Research Record, 2000Description: nr 1721, s. 31-8Subject(s): Bibl.nr: VTI P8167:1721Location: Abstract: In Taipei City, the deep-raft foundation is the most common foundation type for typical commercial buildings. It is known that deep-raft foundations below a high groundwater table are associated with uplift-pressure problems. Conventional solutions, such as increased dead weight, tension piles, or ground anchors, are costly, time consuming, and sometimes inefficient. A successful approach using a geosynthetic system to stabilize and relieve the hydrostatic uplift pressure within the impervious strata is presented. Filtration, clogging, transmissivity, and other properties of geosynthetics are specified to assure the dissipation of uplift pressure in the long run. The design concept was applied in practice to a multistory commercial complex. Two typical cases are introduced. Monitoring results are also covered. Based on the site experience, the installation of this system was found to be rapid, simple, and cost-effective.
Item type: Reports, conferences, monographs
Holdings
Current library Call number Status Date due Barcode
Statens väg- och transportforskningsinstitut Available

In Taipei City, the deep-raft foundation is the most common foundation type for typical commercial buildings. It is known that deep-raft foundations below a high groundwater table are associated with uplift-pressure problems. Conventional solutions, such as increased dead weight, tension piles, or ground anchors, are costly, time consuming, and sometimes inefficient. A successful approach using a geosynthetic system to stabilize and relieve the hydrostatic uplift pressure within the impervious strata is presented. Filtration, clogging, transmissivity, and other properties of geosynthetics are specified to assure the dissipation of uplift pressure in the long run. The design concept was applied in practice to a multistory commercial complex. Two typical cases are introduced. Monitoring results are also covered. Based on the site experience, the installation of this system was found to be rapid, simple, and cost-effective.

Powered by Koha