Welcome to the National Transport Library Catalogue

Normal view MARC view

Two test level 4 bridge railing and transition systems for transverse timber deck bridges Faller, Ronald K et al

By: Publication details: Transportation Research Record, 2000Description: nr 1696, s. 334-51Subject(s): Bibl.nr: VTI P8167:1696:1Location: Abstract: The Midwest Roadside Safety Facility, in cooperation with the Forest Products Laboratory, which is part of the U.S. Department of Agriculture's Forest Service, and the Federal Highway Administration, designed two bridge railing and approach guardrail transition systems for use on bridges with transverse glue-laminated (glulam) timber decks. The bridge railing and transition systems were developed and crash tested for use on higher-service-level roadways and evaluated according to the Test Level 4 safety performance criteria presented in NCHRP Report 350: "Recommended Procedures for the Safety Performance Evaluation of Highway Features." The first railing system was constructed with glulam timber components, whereas the second railing system was configured with steel hardware. Eight full-scale crash tests were performed, and the bridge railing and transition systems were acceptable according to current safety standards.
Item type: Reports, conferences, monographs
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
Statens väg- och transportforskningsinstitut Available

The Midwest Roadside Safety Facility, in cooperation with the Forest Products Laboratory, which is part of the U.S. Department of Agriculture's Forest Service, and the Federal Highway Administration, designed two bridge railing and approach guardrail transition systems for use on bridges with transverse glue-laminated (glulam) timber decks. The bridge railing and transition systems were developed and crash tested for use on higher-service-level roadways and evaluated according to the Test Level 4 safety performance criteria presented in NCHRP Report 350: "Recommended Procedures for the Safety Performance Evaluation of Highway Features." The first railing system was constructed with glulam timber components, whereas the second railing system was configured with steel hardware. Eight full-scale crash tests were performed, and the bridge railing and transition systems were acceptable according to current safety standards.