Welcome to the National Transport Library Catalogue

Normal view MARC view

Maintaining tracks and traffic flow at the same time Forsgren, Malin ; Aronsson, Martin ; Gestrelius, Sara

By: Contributor(s): Publication details: Kista Swedish Institute of Computer Science, SICS, 2011Description: 20 sSubject(s): Online resources: Abstract: In an ideal world, all railway tracks would be available to trains at all times. In reality, track sections need to be closed every now and again for track maintenance and upgrades in order to ensure a satisfactory level of safety and comfort. In this paper, we present a MIP model that optimizes a production plan with regard to both trains and preventive maintenance. The planned maintenance activities may not be canceled, but may be moved in time within pre-defined time windows. Trains may be moved in time, redirected to other parts of the geography, or even canceled. The goal for the optimization is to find the best possible traffic flow given a fixed set of planned maintenance activities. In addition to presenting the model, we discuss the current maintenance planning process in Sweden, and exemplify the usefulness of our model in practice by applying it to two typical scenarios.
Item type: Reports, conferences, monographs
No physical items for this record

In an ideal world, all railway tracks would be available to trains at all times. In reality, track sections need to be closed every now and again for track maintenance and upgrades in order to ensure a satisfactory level of safety and comfort. In this paper, we present a MIP model that optimizes a production plan with regard to both trains and preventive maintenance. The planned maintenance activities may not be canceled, but may be moved in time within pre-defined time windows. Trains may be moved in time, redirected to other parts of the geography, or even canceled. The goal for the optimization is to find the best possible traffic flow given a fixed set of planned maintenance activities. In addition to presenting the model, we discuss the current maintenance planning process in Sweden, and exemplify the usefulness of our model in practice by applying it to two typical scenarios.