ACDM Lite Hemavan : Processes, Actors and Use Cases
Publication details: Norrköping : LFV, 2017Description: 33 sSubject(s): Online resources: Notes: Project: SPARA2020 Abstract: Description of work and processes at Hemavan Airport with focus on arrival process and departure process when introducing a set of elements from the European Airport CDM concept. Digital air traffic solution is also addressed with links to Stockholm-Arlanda Airport (Control Tower), Air Traffic Control Center in Stockholm (ATCC Stockholm) and Network Management Operations Center (NMOC) in Brussels. This document will mainly focus to describe Processes, Actors and Use Cases related to a flight from Stockholm-Arlanda Airport to Hemavan Airport and also the return flight. - Bilaga 1. Technical description http://trafikverket.diva-portal.org/smash/get/diva2:1746957/FULLTEXT01.pdf - Bilaga 2. Validation & Verification http://trafikverket.diva-portal.org/smash/get/diva2:1746958/FULLTEXT01.pdfProject: SPARA2020
Description of work and processes at Hemavan Airport with focus on arrival process and departure process when introducing a set of elements from the European Airport CDM concept. Digital air traffic solution is also addressed with links to Stockholm-Arlanda Airport (Control Tower), Air Traffic Control Center in Stockholm (ATCC Stockholm) and Network Management Operations Center (NMOC) in Brussels.
This document will mainly focus to describe Processes, Actors and Use Cases related to a flight from Stockholm-Arlanda Airport to Hemavan Airport and also the return flight.
- Bilaga 1. Technical description http://trafikverket.diva-portal.org/smash/get/diva2:1746957/FULLTEXT01.pdf
- Bilaga 2. Validation & Verification http://trafikverket.diva-portal.org/smash/get/diva2:1746958/FULLTEXT01.pdf